To renovate the former golf course into a residential subdivision, O’Risky Excavating constructed roadways and treated them with a process called Lime Stabilization. Lime Stabilization is completed to help dry out and stabilize the dirt in preparation for Asphalt, Concrete or Gravel, to be placed over the dirt to create a working roadway.
Read More»This was a very challenging project from the start. The very rough terrain included a 150’ vertical drop that had to be formed into a manageable slopped driveway down to home site. All site utilities had to be jack hammered underground and sleeved for adequate protection from rock damage.
Read More»Upon completion of the septic system installation, you will receive a detailed booklet about care, maintenance, and “dos and don’ts”. In order to keep your septic system in top performance, it is important to have it serviced annually. Contact us to set up your annual Septic System Inspection.
1500 gallon septic tank and 1000 gallon dosing tank Presby Bed w/(3) 85′Read More»